Every tool lives in the Tools tab — the raised button in the bottom bar — grouped by trade. A bundle's tools appear in the tab while you own that bundle (bundles need Pro). Each tool is one screen with one job: enter the numbers you have on site, read the result, and — where a result belongs on a quote — tap Use in quote. Using a tool never forces anything onto a quote.
Follow your code. Where a tool uses code data, its screen names the source: Canadian tools draw on the Canadian Electrical Code (CSA C22.1); US tools draw on the National Electrical Code. Follow the code adopted where you work, including provincial or state adoption and local amendments, and follow the current adopted edition. The authority having jurisdiction has the final say. Tool results are estimating aids — check every result before you rely on it.
Electrician tools
Voltage Drop
What it answers: for a run at a given load, how much voltage is lost on a wire size you pick — and what size to run instead. It returns the drop at the load, the smallest size that holds the limit, and the size to run.
You enter: system voltage, load (amps), one-way run length, conductor material (copper or aluminum), phase (single or three), and the wire size to check. You also pick the verdict wording: CEC (Rule 8-102 maximum) or NEC (recommended limit).
You get: the voltage drop for the size checked, the smallest size that holds the limit, and the recommended size to run.
Step by step
- Open Tools → Voltage Drop.
- Enter the system voltage, the load in amps, and the one-way run length.
- Pick the conductor material and the phase.
- Pick the wire size you were thinking of running, and the verdict wording for your market (CEC or NEC).
- Read the drop, the smallest passing size, and the size to run.
Planning estimate: it assumes power factor 1 and ignores reactance (fine up to 2/0 AWG). The authority having jurisdiction has the final word.
Conduit Fill (NEC + CEC)
What it answers: does this set of conductors fit this conduit — and what is the smallest EMT that passes? Count every conductor in the conduit, grounds included.
You enter (US / NEC): the count of THHN conductors at each size from 14 AWG to 4/0 AWG, and the EMT conduit size. A short nipple (24 in or less between enclosures) can be flagged for the 60% limit.
You enter (Canada / CEC): one conductor type (600 V class), the count at each size, and the EMT size by its metric trade size. One conductor type per run — for a mixed run, the tool's own guidance is to pick the type with the largest area for every conductor, which errs on the safe side.
You get: the fill check against the limit, a diagram of the conductors in the bore (not to scale), and the smallest EMT that passes.
Step by step
- Open Tools → Conduit Fill. The regime follows your market: NEC in the US market, CEC in the Canada market.
- Enter the conductor counts by size — every conductor, grounds included.
- Pick the conduit size (and, for NEC, flag it if it's a short nipple).
- Read the verdict and the smallest EMT that passes.
NEC mode is based on NEC Chapter 9. CEC mode is based on CSA C22.1-21, Rule 12-910, Tables 6/8/9 — the Canadian fill data is from C22.1-21, one edition behind the current C22.1:24, so check the current book before relying on a fill result. The CEC has no 60% fill allowance for short raceways, so Canadian mode has no nipple toggle. Follow the current code adopted where you work, including local amendments — the authority having jurisdiction has the final say.
Service Load (NEC 220.82 + CEC 8-200)
What it answers: for a single dwelling, what is the calculated demand — can the existing service take a new load (a hot tub, an EV charger, a suite), and what service size does the load need?
You enter (Canada / CEC 8-200): living area (m²), electric range (kW), electric space heating and air conditioning (W) and whether they're interlocked, tankless water heater / pool / spa heating (W), EV charger (W) and any EVEMS limit, and other loads over 1,500 W each.
You enter (US / NEC 220.82 optional method): living area (sq ft), range, appliances at nameplate (VA), heating and air conditioning, separately controlled heating units, and heat pump details where they apply. EV charging is counted at nameplate with the other appliances.
You get: the calculated demand and the service size the load needs.
Step by step
- Open Tools → Service Load. The method follows your market: CEC Rule 8-200 in Canada, NEC 220.82 in the US.
- Enter the living area first.
- Add the loads that are actually in the dwelling — range, heating, cooling, water heating, EV charging, and other large loads.
- Read the demand and the service size, and compare it with the service that's installed.
CEC mode is based on CSA C22.1 (CEC) Rule 8-200; US mode is based on the NEC 220.82 optional method for a single dwelling. Follow the current code adopted where you work, including local amendments — your inspector has the final say. In CEC mode, the floor-area test uses floor area excluding the basement.
Pot-Light Layout
What it answers: how many pot lights a room needs, the grid to mark out on the ceiling, and whether the layout hits the brightness you want. Spacing is half the ceiling height; the wall offset is half the spacing.
You enter: room length, width, and ceiling height; lumens per fixture; and the brightness target in lumens per sq ft (a planning value — adjust it to the room). A relaxed-spacing option (up to 1.25×, for living rooms and bedrooms with dimmers) is available.
You get: the light count, the layout grid as a diagram (not to scale), the spacings, and a brightness check.
Step by step
- Open Tools → Pot-Light Layout.
- Enter the room length, width, and ceiling height.
- Enter the lumens of the fixture you're using and the brightness target.
- Read the count and the grid; mark out the ceiling from the spacings shown.
- To price the lights on a quote, tap Use in quote.
Use IC-rated, airtight fixtures where insulation touches the ceiling; an ESA notification applies to new circuits in Ontario.
Conduit Bending — 7 bend types
What it answers: where to mark the conduit for a hand bend — the layout marks, from the manufacturers' chart values (IDEAL, Klein, and Gardner Bender agree on them). The same marks apply in Canada and the US; bending math doesn't change at the border. Diagrams are not to scale — the marks govern.
The 7 bend types:
| Bend type | You enter | You get |
|---|---|---|
| Stub-up (90°) | EMT size, stub height | The stub mark, using your bender's take-up |
| Offset | Bend angle, offset depth, distance to obstruction | Both offset marks and the shrink |
| Saddle (3-bend) | Obstruction height, distance to the obstruction centre | Centre and outer marks (covers obstructions up to 6 in) |
| Four-point saddle | Obstruction height and width, distance to the near edge of the obstruction | All four marks |
| Kick with 90° | Stub height, kick height | The kick marks |
| Rolling offset | Rise, roll, distance | The true offset and both marks |
| Parallel offsets | Offset depth, distance, centre-to-centre spacing, number of conduits | The adjusted marks for each conduit in the run |
Step by step
- Open Tools → Conduit Bending and pick the bend type.
- Pick the EMT size and check the take-up stamped on your bender.
- Enter the measurements for that bend type (see the table above). Note the measuring point: the 3-bend saddle measures to the obstruction's centre; the four-point saddle measures to its near edge.
- Read the marks and the diagram, and mark the conduit.
- If the tool says no marks fit, move the fixed point farther from the obstruction, or use a smaller angle or depth.
Transformer Sizing
What it answers: transformer sizing both ways — from kVA to primary and secondary amps, or from load amps to the kVA you need — with the code protection for each side. Scope: dry-type and general-purpose transformers, 1000 V or less (US) / 750 V or less (Canada).
You enter: phase (single or three); the sizing direction (have the kVA, or have the load amps); the kVA or the secondary load amps; primary and secondary voltages (presets or enter volts); and the protection method — primary protection only, or primary + secondary.
You get: the amps or the kVA you asked for, plus the overcurrent protection sizes for the primary (and secondary, if chosen).
Step by step
- Open Tools → Transformer Sizing.
- Pick the phase and the sizing direction.
- Enter the kVA (or the load amps), then the primary and secondary voltages.
- Pick the protection method.
- Read the sizing and the protection for each side.
US protection is from NEC Table 450.3(B); Canadian protection is from CEC Section 26, Rule 26-254. Follow the current code adopted where you work, including local amendments — the authority having jurisdiction has the final say.
Wire Pull Labour
What it answers: how much labour one conduit pull takes — in man-minutes, and in elapsed time for your crew size. The estimate is built from your own wire-pull rates in Prices (minutes per foot of run and per wire), adjusted for conductor size, bends, conduit fill, pull method, and conditions.
You enter: the conductors (counts at up to two sizes), the run length, the total degrees of bends (two 90° bends = 180), the conduit type and size (fill is computed from the conductors and the conduit, using the same code tables as the Conduit Fill tool), the pull method (hand / fish tape, or mechanical tugger), the conditions (normal, difficult, very difficult), the crew size, and optional setup time. An optional junction-box spacing — a box every X feet — can be turned on and is saved on the device; it is your own shop standard, not a code rule.
You get: the labour for the pull in man-minutes, the elapsed time for the crew size, the computed fill with its code verdict, and the setup allowance shown on its own line. Crew size only turns man-minutes into elapsed time — it never changes the labour. Pull only — terminations are priced separately.
Step by step
- First, set your wire-pull rates in Prices (the wire-pull row: minutes per foot and per wire).
- Open Tools → Wire Pull Labour — or start from one of its presets and adjust.
- Enter the conductors, run length, and total bend degrees.
- Pick the conduit type and size so the fill is computed; check the fill verdict.
- Pick the pull method and conditions, set the crew size, and add setup time if you want it on its own line.
- Read the labour. To put it on a quote, tap Use in quote — it lands on the quote as extra labour time.
Segmentation follows the code bend limit: a run of raceway between draw-in points may not exceed the equivalent of four 90° bends (360°) — CEC Rule 12-942, and the NEC mirrors the same cap. Junction-box spacing, when you turn it on, is your own standard on top of that — the app labels it as yours, never as code.
Plumber tools
Planning estimates only. The plumber tools' sizes use US IPC / UPC model-code tables — Ontario Building Code Part 7 (O. Reg. 163/24) values have not been checked. Follow the current plumbing code adopted where you work, including local amendments — your inspector has the final say.
Fixture-Unit Sizer
What it answers: from a fixture count, the peak water demand and supply size, the drainage load and drain size, and the slope and fall over a drain run.
You enter: the fixture counts — bathroom groups (flush tank or flush valve), water closets, lavatories, bathtubs, showers, kitchen sinks, dishwashers, clothes washers, laundry trays, bidets; the system type (flush tank or flushometer valve); the code table (IPC or UPC); the drain run length; and the drain pipe size for the slope and fall. Count a full bathroom as a group OR as its three fixtures — never both.
You get: peak demand and the supply size, the drainage load and the drain size, and the slope and fall for the run.
Step by step
- Open Tools → Fixture-Unit Sizer.
- Count the fixtures — groups or individual fixtures, not both for the same bathroom.
- Pick the system type and the code table (IPC or UPC).
- Enter the drain run length and the drain pipe size.
- Read the supply size, drain size, and fall. To carry the work into a quote, tap Use in quote.
Water Heater Sizer
What it answers: the water heater size a household actually needs — sized by first-hour rating, not tank gallons (a 50-gal tank does not deliver 50 gal in a busy hour). It uses the US DOE method: count the uses in the household's busiest single hour. A tankless check is included.
You enter: the busiest-hour counts — showers, shaves, hand dishwashing / food prep, dishwasher loads, clothes washer loads (top-loader and front-loader counted separately); and the fuel (gas or electric). For the tankless check: showers and faucets running at once, and the incoming water temperature.
You get: the first-hour rating the household needs and the heater size to match, plus the tankless flow requirement.
Step by step
- Open Tools → Water Heater Sizer.
- Count the uses in the household's busiest single hour.
- Pick the fuel — gas or electric.
- Read the first-hour rating and the size to install.
- Optionally run the tankless check, and use the toggle to price the tankless option in the quote instead. Tap Use in quote to carry it over.
Repipe Estimator
What it answers: the material and labour estimate for a repipe, from your measured pipe lengths. The estimator never guesses a length — you enter what you measured.
You enter: PEX 1/2 in length, PEX 3/4 in length, and Copper Type L length (feet); angle stops to replace; main shut-offs to replace; and how labour is priced — none, the flat whole-house repipe item (all materials, or the copper variant), or hourly with estimated hours. Pipe is priced as material per foot; labour is the flat item or hourly, never both.
You get: the pipe material cost and the labour line, ready to check against the job.
Step by step
- Measure the runs on site first — the estimator works from your measurements only.
- Open Tools → Repipe Estimator and enter the length for each pipe type and size.
- Enter the angle stops and main shut-offs to replace.
- Choose the labour pricing: none, flat, or hourly (with your estimated hours).
- Read the estimate, then tap Use in quote to carry it into a quote.
Drywall tools
Drywall Takeoff
What it answers: enter a room once and get the whole material list — sheets, compound, tape, screws, and bead — plus the installed price from your drywall price book.
You enter: room length, width, and wall height; whether the ceiling is included; the sheet size (4×8, 4×10, or 4×12); the finish level (Level 4 or Level 5); the room complexity, which sets the waste allowance (simple 10%, cut-up 15%, vaulted / angled 20%); outside corners; door and window counts to deduct; and the options that apply — sprayed texture, PVA primer, removal of old drywall.
You get: the sheet count and the compound, tape, screw, and bead quantities, plus the installed price.
Step by step
- Open Tools → Drywall Takeoff.
- Enter the room length, width, and wall height, and include the ceiling if it's being boarded.
- Pick the sheet size and finish level, and set the complexity honestly — it drives the waste allowance.
- Enter outside corners and the doors and windows to deduct; turn on texture, primer, or removal if they apply.
- Read the material list and the installed price. Tap Use in quote to carry it into a quote.
Stud & Track
What it answers: for one straight metal-framed wall — how many studs to cut, how long, the track pieces, and the framing screws.
You enter: wall length and wall height, stud spacing (16 in or 24 in on centre), and the number of openings (doors + windows).
You get: the stud count and cut length, the track pieces, and the framing screw count, with a layout diagram (not to scale — opening positions are schematic; the counts are in the numbers).
Step by step
- Open Tools → Stud & Track.
- Enter the wall length and height.
- Pick the stud spacing and enter the openings.
- Read the counts. Corners and tees add 2 studs each — add them by hand; track is the flat bottom + top runs, and no waste is in the count.
Sheet Layout
What it answers: how the sheets actually fall in one room — the count, the butt joints, and the real waste, for each wall and the ceiling. Whole sheets only: offcuts are counted as waste, never reused on another surface, so small rooms show high waste. This count is exact for one room — the takeoff's waste percentage is a bulk-estimate figure.
You enter: the room size and sheet size, how the walls are hung (vertical — long edge up, or horizontal — long edge across), and which way the ceiling sheets run (along the room length or along the width).
You get: the sheet count per surface, the butt joints, and the waste, with a per-surface diagram (not to scale).
Step by step
- Open Tools → Sheet Layout.
- Enter the room size and pick the sheet size.
- Pick the wall orientation: horizontal is the usual wall choice (fewer butt joints on long walls); vertical suits walls no taller than the sheet.
- Pick the ceiling direction.
- Read the count, butt joints, and waste for each wall and the ceiling.